Show all 0 SL TS irs setting forth that unless opeo dy stepa steps are taken to rive give utah a com prelle enslie tishe and complete hydro gra chic survey report several prospective irrigation projects of much importance will be delayed and possibly abandoned the special committee appointed by the utah development de elop executive board waited upon the stata land board last week with a request that ways and means be devised tir raising the tile necessary funda funds to the preparation of the report the las as legislature appropriated four thousand dollars for this purpose to be used during the nio two eara ears chis Is 14 bald said to be fa inadequate Imd equate even though the government does furnish an equal amount with ith the towards towar d H the work vier some discussion discus gion it was de d cadd to take the matter up alth alt h the governor and the attorney ln oral eral to learn earn just what state aundt can ti it used for an additional appropriation atlon in it legal manner it is 1 possible that the cirey carey fund or some similar nillar ei euid tu id will bo be invaded to meet the urgent need rhe work ork ie Is to be dono done under he direction of the state ung engineer ineer neer and the united states geological suney members of the land board state that enery possible pressure will be brought to bear to have an immediate survey mide made |