| Show PRACTICAL MACHINE SHED FOH FOR FA A bood machine thed la Is ono one of nt ill th money buildings of a all 1 farm it should be so to i u that tho the implements can be therein with the keast Ios possible sible ineat if it tt it la Is to lter the iril clements nt ts of every day use na em it should b uj near as a po taffita hl to the place where the unhitching ts Is done as a man I 1 la ari nat to yield to the temptation of if it ving tving it n machine out 0 doors finhen ho must pu gu fur far out ot of the way to put it into a blied another inconvenience Is to liao hae it located on ground inclining slightly toward the s hed and in this way heavy machiner may be backed in by blind all that teat ie Is necessary being to raise ral tho the tongue and direct its itz course doun the incline and into int tho the shed avery I 1 very nian ohrt haa has backed machinery into a shelf with mith horses iea realizes leall lizes zea that at there la Is mote or less liability to accident accidents in placing vehicles or machinery in a shed by horae juo erp er especially if it the building is la well well filled with anat it should be b at a least lest 16 feet alde wide to accommodate date wagons and canute spreaders spread ei und even thin a portion of tha the tongues must be on the outside aa tf to length this may way be arranged to alt the amount or machinery that it hlll be ne cestar to fi nelter lake large cedar cellar posts which aro are I liepa vt at moat lumber yardia ir r in ahn lerea berel sections or post posts may nilly be taken giom the lot 11 these should be set in the ground ight eight or ten apart or ht at such distances di us as will permit the machinery of to nasr bet between veen tho the poet holes should be dug hamd 1 to allow tamping them with krout grout made of aen cement tent and sand it hii Is alo alio advisable io to place a lat flat rock in tho the bottom of 01 0 il 0 to rima V 4 each hole to afford a substantial ki ir port to the till this shed can be boarded alid roofed to suit the tastes of or the tho builder tho the entire front fron t should bo be provided nith sidling doors las ing la in front of thea a cheru it allt be to have swinging awl nging doors with openings for the tongues which extend partially outside tahe tb b blante bi lune of the aront may inay bo be coi co ered alth 11 sliding door doors eaher aping on a double track thit th it the may elide slide past rast each othet vi 01 on oil a single track tivit must extend beyond the end ut of the building as it Is often desired tu bae a lanae lart of or the building open nt at the aam atm time the ground should be bior cr leel about the shed shell hat that the boarding land and doors giuy come ahue to the ground D keep out the as there la is no do other place pl ae as for roosting roo atin for chiche nh and tur tures e a as on the machinery in the machine olied it t Is well to have the conro hit big so that the binder may be put pill in without tal tak ing off me reel or top aa etc without lowering the tops rae difficult i of the posts ro rotting ring at the top toi of the cement as they do when set out gilt of doors Is not experienced afien they are plated placed on the inside of a building |