Show the debeque fields i a increased production of oil from froin well no 2 within tile past two aft java na ns a it result of tho tile pumping which tins now been in n progress since tho the bali of tit tho month lit Is mosten most encouraging cour bayis the tho debeque colo bug bugle le of alio la fact it may bo stated with perfect confidence and cloe clos 3 hd ad he heresco retice to the facts flint that tho tile pinn plan of pumping the water from the well lias tins town vindicated and it will be only a qu question of timo until no 3 anvill will DC ame a kalug oil well applying tho the same trent treatment ment to no 1 which will undoubtedly W 1 dono done eoon soon it Is pre pretty tty safe to any say that that too will iw be pumped tile many disappointment 4 that hine hill 10 been met with ith it can now bo be said that the tile outlook of the tile debeque it ile I 1 was never neer brighter |