Show arbitrators FINISH WORK tile the labor assigned lion W 1 it rone roe and lion R E U davis dan s of arbitha arb itra ting the differences between the county commissioners and the ogden northwestern railway co with respect to the right ofray of way around the bill just north of willard has been completed and the gentlemen secured tile the right odway forthe for the electrical electrical line and col county anty road around the hill at a ery fair cost to the parties involved in speaking of the matter sir mr rowe stated to a news representative that lim h bad discovered that the route ar aund the hill with all the expense entailed therein will be cheaper thin than it would be to cut down the hill and make the big fill that was suggested besides doing away with the dangers caused by a high pike and grade the gentleman further said that the arbitrators feie meie in perfect harmony in mery every step they took each one viewing the question in the same light the insult being that the labor was most pleasant and now the gentlemen feel very ery much elated over their s success |