| Show MANAGER GILLIES GILLIESON O ON THE MO TA Quarterly Report Covering First Three Months ol ot This Year Vear lias has Been Received DEVELOPMENT ON OU LEVEL Drilling on oa the Ledge V to Sink New ew Three Com COUl I Local of ot the tho Montana Minis company during tho the day Ilay received the tho quarterly quarter report of General Maniger Donald U B in lit 11 Which tIme the statement Is m de that dur dUI during ing ini the tho Ort lint three months ot of the year yeara a it total of ot feet teet of development work completed On the level which Is III tho tue dl of ot tho the present shaft the develop development mont ment work has hns not ban baen very Iy active due to poor air all can by hy having no ito connection with the time upper levels love Is A connection was 18 made marie however during the tho latter hitter part of March and work will now be pushed on this level hovel u us rapidly AS till At t prent preen Mr states state drifting III In In progress east anti and west on thu vein and that It Is only nitty to say any that the grade of ore Is the same a me as at hue has Ins ben bam developed else elsewhere where in the tho th mine alid that he con considers elders siders the finding of oi the vein with those conditions coalitions on the lower level levei of thu this mine to 10 be hI of very err great Importance Continuing further Manager says Bays Six lc Hundred Foot I oot Level LevetOn On title this level I el the tha vein has never been lo ho loc c or worked and was sas BS known as nj asor or 01 0 colled tho the lost I 1 am ama pleased to 1111 10 to to state stale that same has hall been beell found und amid crosscut at 50 M feet below tho tIme BOO evel timid also on 01 the tho GOO level and the ore re is III nil all of a line tine chipping ginde graie We Vie therefore have hao a 1 block of ground flom this level lesel to th liu u on which no I imn ti Uti ut The Tho vein oln on this level shows no particular change to report other than our ore oro bodies are proving much wider Ider than we wo expected Five II hundred 1 Foot I oot Level During the tIme early earl ear part of the th month of ot January a It new vein oln ras ns crosscut which 1 I have called the tho MartIni Martha and which varies sark lIrk In width as liS for far ns liB worked from fro three to III six l feet Another crosscut was 8 run nt at nta ata a 1 point teat feet distant front mont tl e first ono one tho the some same vein was nB encountered within five feet teet of where whore santo same was projected r Its width at this point 1 Is about four foul feet h grade ship shipping ping lung At this title mention that this tItle same canto vein oln has hns boon been cro cut on tho the level above called the CO This Is thu the most mOlt Important development during the quarter Tho rho MacDonald and south veins of ot this level are producing thu nr du of shipping ore oro Four Hundred Foot LevI Level On this the tha liNt level hotel In tho the mine until two w ago ngo tho the development consisted of iv a short drift to the thu east to the con contact contact tact tRet the tho Inter later or cup pine ami the early or lode lodo por POl porphyry porphyry Ihry arid and a n crosscut to the this MacDonald In Wo Vo lire are now how drifting on the veins crosscut Oath both In un an easterly and westerly direction timid notwithstanding standing the closeness to the capping the tile ore oro are well defined and of good grade grado V VIn In Ill my last III t report mention made mAllo of a n new vein on the level leel which I 1 have hae culled called crt lied the A H II K I No work ark has been beon done on It during the duo due to the fact that our present equipment Is III taxed to Its tit utmost capacity at nt present Ind this vein can be bo developed tn to much better bettor advantage through our proposed 1 now IO shaft During Daring the tel tee wo we havo have installed n II new MW power boiler a II m new Ingersoll compres com reH sot sor four our drills We have sintered severe sovere delays through failure allure of our water sater supply We WI are III ready leady to begin the sinking of a 1 new nent shaft which Is a necessity V At t no time during hiring the history hi tory of ot tho the thomine thomine mine hns has It looked ed no so well us its today and amid considering the great area of ground which we own north of our OUI shaft anti and which w we are lire now develop ing lag together together with the great gront strike In Inthe inthe the Midway adjoining our Welt line IIno anti and which Is III now nOI within feet teet of the same Mine me and the time equally Important unit late strike in the Golden Anchor both bothof b bOthof th of ot these thele strikes meaning almost an as much to tn our company gs as to their own I 1 feel fully tilly rull justified Jimmied in III saying that our future Is II exceedingly bright |