| Show 1 I I LO LONGEST Gf T TRAM ROPE I IN Has Hns Been Installed In Little Itc Cot Cotton Cottonwood Cottonwood ton wood by Coo Con Alta Ala Mines Company r ABOUT READY FOR COMMISSION Time The Start Starr Will Wi Probably be Hade Within Next NeIt Ten Days A lUg Dig Achievement The Tho aerIal tramway system which the Continental Aunt Alia Aln MInes Smelter corporation has hn Installed In 11 the tho LIttle mining district nt at a n cost of ot approximately Is I corn com completion cor The Time upper tIpper two to a halt half miles of oC tho the line lime In Including the tho terminals etc Is l ready really tar for commission while down on the th lower tower end a 1 force of men Is l engaged In stringing the Iho buckets tightening the tho ropes rOIel otherwise looking Into every overy detail connected connected with nitin tho the putting on of ot tho the finishing touches There hero Is of ot more than or ordinary Interest t connected with the tho con concon construction con of ot tills this fivemile ropeway which Is la to connect the time mines at Attn Alta Ala with tho the mill mi on Tanners Flat Fiat Anyone Anone 10 keeps well el posted with wih tho tine progress of ot mining develop development ment mont In tho time west understands that hat tine tho F tramway In Wyoming has the tim distinction dl of t f being the longest In un tIme the world 17 unites miles Hut html 1 II it Is built bui In sections each about four tour tithes miles long which are operated o with separate power plants lint Hut time the Continental Alta ln tram tramway tramway way Is equipped with wih the longest steel teel wire rope rOIe over er strung along n a 1 aline line lino Ino of tramway towers tower This Is what Is II ns as ni tho the carrying rope rOIe and Its length lel tl Is 10 mallets anti to It are at nt attached tanned th the bucket conveyors In which a 1 world of ot wealth will nill wi be brought down cown from train tho timo Alta Aita mines during the next I few fel years I When seen een today Manager Henry M Crowther would not riot pay cay positively on out 01 what whal date the tram truman system lIy tem and anc mill mi will be bo placed lincel In commission for this th reason annoying delays are aro frequently encountered to upset up et plans While ha hp docs tOOR not met anticipate anything of at o this kind 1 ni nevertheless n e ho lie proPOses propose to play pIn safe nato and nn make moko when nil all al the machinery I II Is running It I Is In If reasonable to 10 suppose however tile the start will wi be he made within the time next 10 I Manager Crowther huts has hll done Ilon some eo ex ox excellent celent work In equipping the mines He Je III ii tot ot commence this thle big hiI undertaking I late lot let fall fail but he One has ban hOI made ever minute of oC the tho time count Delays In the shipment of ot material and machinery anti a 1 of If had bad h ll weather served f red an nA drawback but n with wih all I tints this fn On fl I I contend with wih time the progress has brie hn moon been really rOlly remarkable Every Everything thing line has been n done dono with wih n a syu SYI ton Im t mn to tl It but tints this II is H characteristic of at Mr Mi ll operations and Ii Is 1 out one of the tho things linings that In Is If contributing to his hie sliced as os a I mine minD manager malger and a 11 operator The Time Continental Alta AHa mill mi line lias lal been h en built with wih capacity for tor the treatment of 10 tons ton of ot ore dally daily but other units casion caslon e will wi lon bo Ito 10 demands added 1111 traIn from It I time to time as lS oc oe occasion or |