OCR Text |
Show WOOD PIPE LINE MATERIAL ARRIVES Tv.o car loi h of 1 1-2 by G ti.tb lumber fiom 11 l0 37 feet long nriiv. ed In I.ehl Monduy nnd went hnuled I" the I'tnh Luke Irrigation Company's Com-pany's plant, south of Saratoga where they will bo used In building two pipe linos, one of the lines will be 49 Idles In diameter and 3,000 feet long and the other will be 1,000 feet long nnd 30 Inches In diameter. The larger larg-er pipe will empty Into the high line canal, and the smaller one. Into the new canal being built midway between be-tween tho level of the lake and the big cannl. The building for tlio new mnehln-ny mnehln-ny hns been completed. The new pumps and electric motors will nol nirlvo for another month, but will bo Installed in time for when the mnx-inum mnx-inum supply Is demanded In July |