Show MAKING 1 11 SG I Power ur Plant About to ho Ac tc Accepted C at The representatives of ot the firm which supplied the engine engines and boiler for lor the power plant at the nua mill In Heaver Deaver county are on ott the ground round for lor the purpose of making the final test teete till preparatory to turning them over ov to Urn till official ot or the company who took look the train for tor the south couth lOut last latt Gradually the big plant Is getting doug along completion Nearly early all the lite buildings are under cover find and Urn tim machinery Is III being installed just an ma rapidly at as I under the direction of W S C Thomas Thoma |