| Show A I furnaces lur O lo to he be Added lo to Iho Ihu II i I IT Ic ym at al It Ith Wk Mk h learned 1 from an authentic I III Ii to have hav considerable lf ne n nw equipment IMn lidded added lo to It I In tim th tb the very near i i future Waller Walle Ke y Ih the general ener I manager waa WI II In anti and could runt not be reached before press prem time timeless the News New N In stated that re are ft to 10 be In Installed stalled mailed and th t the plant otherwise made mudo Into an The punt plant will be bf brought bL up rip to 10 th the dully daily 41 c capacity of 0 bAd M tons ton |