Show GRADING EAST TEMPLE Work on Cut to Capital Hill Grounds lias Un Began Car Extension Active work on the the excavation ex of oC the cut to bo be made on north East Bast Temple street for tor the new noW grade has hils been start started ed cd The Tho work recommended by engi Engl engineer neer veer Kelsey KelBey contemplated d a cut of ot the tho maximum depth lIe del lh of or about 11 It feet feel with witha a II 1111 Ill which would reduce tho the heavy of or the Capitol hill hilt grade to about g 8 per ter cent In its the tho main there thero being belne only on ler a 1 very er short distance In which the grade grudo would reach 10 0 per cent The Tho street car track will be extended to the Capitol hill grounds as ns soon ns ItS the work Is completed but property properly owners owner are arc not nol In harmony yet as nS to the details of the Improvement and a II meeting will be bo held with the tho city elt council committee having tho the nut mat nutter matter ter In hand band The Tho new city engineer will wll be present |