Show STRUCTURAL T L STEEL fO FOR UT UTAH e eIn CONI In Iii Construction of Two Additional Buildings Lk L s of This Material Will Wi be bc Required cd DELIVERIES NOW NOVI HOY BEING BEIG MADE WE I From the Factor Factory of or a Minneapolis Firm Work to Commence lu About Thirty Days The Tho structural material mot for tor the big auditions u to tobe be made to tho the Con Consolidated Consolidated smelter has his begun to arrive from the factory of at the Minneapolis Steel Machinery company and It I Is expected that within tic the neat neit thirty days the tho ho company will wi have a 1 force torce on the ground putting the parts party together Tho Tha Minneapolis linn firm Url was Iwardell tho the contract to erect two additional n build buildIngs buildIngs Ings but In II the tho construction of ot these 1 OOOo pounds of ot structural steel leel will willbo wi wIllbe be bo required The Tho extension to the roast roaster er building will wi be b feet teet long by 60 feet In the ho addition additon to what la Is known us o tho the smelter building will wi be 87 feet long Ion by 79 feet teet In width U It I Is anticipated cd that the tho enlarged plant will wi be b ready for tor commission tome same time during dining the summer Rummer probably In II July or hen Manager Chan Than Thanning ning will wIl bo be In II position to send lend to the refineries of et tho the cast east anywhere from to te pounds of copper bullion bulon monthly The for tor the tho Past year ar was SVa a n little litlo batter heter than lien 1 3 pounds per pCr month monh The Tho To Decem December December ber her and Rod January production was around pounds The Tho ho vow el additions to the smelter are being built buit out of at the fund of ot set aside for tor that purpose some time tinie ago ngo Manager Channing who has been consulting with executive heads In New Now York Is expected home next week |