| Show START IS UBIA Jm Utah Concentrator nt lit Ready ArrIval Hupt Frank 0 n 3 Janny Jann of the Utah Copper company clone camo In train from camp last evening Anti reports everything In to start up at the corn com 11 big concentrator ex cx except except cent that somo delay theISt IH is caused by the tho railroads In not having completed somo necessary The Cop Colt Copper per Dolt Bell road will have hao to build a n lIne lino to the loading station at It tho the thomine mine astute while tim the lIla Hlo Ormula Western estern luis lists a n lIttle work vork to do at nt the tho mill be boo before tore fore ore It will bo ho ready to deliver loaded londell cars cans of ore Hupt Supt Jnnny expected tIm the plant would 0 11 hI go Into commission this week antI It would have done dono HO so luul the tho transportation companies up tip their work ork on oil schedule time The rhe start may many not bo lie made for tor two Manager I n C nr or from Colorado nt at noon today anti will ill probably remain n 1 week weel or 10 19 days |