| Show Till Mow how Stockton Ii Is I equipped sad and nd What It II N I b Doing In his description of or the mine nt at Stockton W W V A Scott representing tho the Engineering Mining Jour mil of or New York contributed the tho fol following following lowing The rho tunnel 6 by h S 8 ft tI Is lion to 0 thu matter of or building smelters tel or reduction rell works work now 1111 In III ft It the heading being with withIn In Iii 60 CO ft ct of or the he main shaft hafL from an un upper tunnel A system of ot veins eills between I and blue limo hub show ore above aboc water r level 1001 and nn heavy heMy heM sulphides at nt and anil below water willer level leel The rite How of or Water sater uter from thu tunnel about gallons of or water later per 1111 minute Is III for tor milling 01 III I 1 K n 1 J Ii Is general superintend superintendent cat ent The rhe new now Bone 11 no mill having a I capacity of or iSO tons taOs In 24 21 hours hourI Is near tho the portal of ot the tho main tunnel Thu The ma ml machinery chinery Including u I Hand pound air nil compressor for tho the drills The Tha TheOre I Ore oro Is III crushed by b a n No 4 Outes Untes crusher r anti and two sets seti of or rolls rOils sized shed by screen jigged classified and concentrated on tables The Tho overflow slimes from till all are nrc classified and settled In tn Sherman slime sHine tanks Tho The products consist of ot various grades grales of concentrates the hulk hull of the oro ore mulct milled Is oxides anti and carbonates the great groat fu future future ture lire of oC the mine being In the tile bodies to be lie taken out through the main mainI I |