Show BY JULY IO 10 First Work Will Wilt bo be Dono Done on Moffat Moffat Moffat fat Line Uno at Utah Junction WILL PUSH PUS lIt to 54 be Iii Completed C t j New Neive fur lir Kill hI Like Leke Denver Colo Cole July Man Manager ager of or the new lIeW Moffat line states that the tho work of ot laying the first track on the roud road will commence on July 10 The first truck track will wilt be Lu laid at nt Utah Junction the site of if the terminal yards yard near Denver 1 und timid from there to Arvada Thu track laying will wilt then follow the tho electric line to and hum from mom time theme the to o a II point 20 miles from tram Denver It ft Is anticipated that tho tile work will willbe Le lio so 10 fur tur along In the grading that at atthe atthe atthe the completion of the first rt 20 0 miles mile can bo ho pushed on to nol Hot at nt the tho bate base of ot tho the main atom range U ft Is IB expected that title this can be Je done by bythe bythe bythe the of ot December |