| Show OUTPUT Figures or May tny Benched Over The several smeltIng concerns oper floor operating nUn In Itt the valley valle have hae balanced d up their May accounts and the tho balance sheet shows that during that period a n total of at pounds of CC cower copper bul bullion bullion bullion lion to the of or if the east The Highland Boy Ito plant heads head the tho list with pound to Its lis credit the American Smelting Sm Henn HennIng Ing lag Co with th tilt com corn and the Ihl d lf thlu thle tin thit American has a 11 large tonnage of ot base bullion to Its credit The Tue smelters limp It en of ot the valley all 1 a I re to ic to during In of or tons ton of ot ore are per perda day da |