Show Ino Un Bt COUNTY J J Good GoodAt GOOl At AI Ills Ils Proportion Manager J 3 J 3 of ot tIme the Beaver Con on and lne Un lien u n Harrison mines minea of ot it Beaver 1 er county count returned to the city cl from camp this It t buIlt both the forces torr are busily bu I engaged In sinking linking the rP t shafts hat At the former a of o 16 15 feet eat has hia been n reached I while bile at tn tie the latter hitter later the bucket drops 49 49 The Indication mit t both beth mines fa tn Arable Air Ir ft state and amid he I 5 Well Plow With tS the condition In which h he poi found things thing Colorado Cuollo Troubles The e wa o of time Ule tie and ru other n a me at t Cripple Cloak oler A CPI mk Mys ly a n ills were entitled to 10 1 shipping ore Or to time the th reduction mills at am atI I Colorado City Cly which are nM having with time the labor minions on Ol and after March Marcin 9 This hl Introduces tie tho t strike limIt Into the tipple Crek district a f ste i the ay YI It wi will to run rUI employing union minion nonunion 11 men as UM can CeI b lie bu secured ll D 0 e Suckling J formerly connected Capt CallI D Do Lumar mines mints In is 8 IU with lh time tho to mentioned l mien men n Toiro Fine Vima 4 A a I tint the Information that hint tine tho Ihl idine of cf IC rintie probably looks het pres prec present emit ent titan than at any al time mr If Its I history VU vol ry flattering reports have rc from rein the tho mine mlle lately Iel To n r Time The company I revise Its iti Il local electric light mind rig pig 11 mini nul service amid Ind Engineer l I Grosh of ot the time General company com pan will wi superintend superintend tend the time work anti and Install a it 1 Dew tI 30 lv hor hOI power generator at tho time mine j Con I 0 U II lal S hf ii a ii The rime management of oC the Centennial Eureka mine amine has preparations almost completed for tor hS time tho slinkIng sinking of oC the tine Shaft hitt I at nt that property The ho probably be b undertaken within jhu jIme few cow days or as soon as lR the Ihl machinery is fOW Installed on tile the tie 1400 level lovI f 1 |