| Show AT Al 1 RII tn I II Is Cro Work On 01 line Iho l len of or Track Special 8 to Tile The News New Emmett Emmet Ida July Uhe Idaho Northwestern Engineering compans grading camp Is now no located two and anda calp a n a half miles mile below and work on the grade rudo Is I being pushed rapidly along alone Hupt Supt McDonald Bald acid sal l today that the tho grading would be bl completed within n two weeks week The rails rail have havo now been b lt ett en laid as tar far as ns a Folks store Tho Tine new now rood rO 1 extends between beten Payette and und Emmett and will wi have Ha Its Is eastern terminus at nt the latter place Tha The de depot depol depot pot pol at al this place will bo bet b a I union depot on account of at the Northwestern being unable to secure right of way to lo get gel through the lower end of the th town It I road would was W agreed that thal the new rall Join the tine Idaho Northern orther At nt tho the SIc MI NIh side nUde track and enter town over ovel one 01 tulle mile of Idaho Northern track track |