| Show PLANS FLANS FOR PLANT NEARLY COMPLETE Power Station to be Built Bui by byChurch byChurch byChurch Church Nearly Ready for Contractors Bids IS OF MOST MODERN DESIGN lao I Preliminary Plans Well Wel ll Almost Ready n aS aSro To ro Submit to tu Authorities Alth Ilic t The modern heating and lighting Ishin plant which js is to be bo built bui by bt b the Church of ot Jesus Christ ot or Saints to take tale care of or the tho numerous nUI rus buildings owned ownell by b the Church on and around the Temple block boel will trill wi be an 1 accomplished fact next summer ac no C cording to tu plans which are arc now bolig hoi formulated by Gray Gry and Grosh con consulting suiting engineers of or this hIs city et TIter Ther report to the committee In charge will willbe wil willbe be b submitted shortly with specifications for foi the work after which bids wilt will wi be called led for tor This Is expected to taku place early cuI in January and ad lie tho work will wIl in all al probability be b pushed to completion to have everything eer In readi reail readiness radl ness next fall fal The he system Is a I most niost elaborate rte one and tho the plan will wl be strictly date The Tho le entire entre system s stem will wl cost cos co be Le between tween tW 1 and It I Includes lr th tug j or of the plant on imi time I e e block V C lf ft west 0 of t nacle naele occupied oc by b Sliver Silver Bro Bros j foundry tho the construction of through the Temple binak blo k and under Ull r the streets so as ns to connect with wih Tem Tm Temple pie Tabernacle Assembly hall bali Bush Bish Bishops ops op s building L D S university build buildings ings togs Deseret gymnasium Hotel Utah Templeton building News building Vermont building and ad Sharon buld ings and the Miller apartments In North Temple emple Arrangements may nico aho be he made to heat and light tho the big building which will trill wi be built bui on the Val Vol Valley Valle boy ley le House o corner n at some rome n future date dato hf The l tunnels nc through which tho ho as asbestos hasten covered c vered steam seam pipes s and thor thoroughly Insulated electric wires will wi be te conveyed to the tho above abo buildings wIlt will wi be beb built b of reinforced concrete Included In the system Is a large modern re refrigerating r C plant for the Hotel Utah The power plant will wl bs ha b fitted with Wll smoke consuming appliances by b means of which with a steele stack tact feet foot high I largely the smoke overcome oVelmo difficulty 11 reu I Is expected ex ced to be |