| Show LOOK LOCK CANAL IS MOST DESIRABLE It Also a Great SaY Sav Saving SaYIng ing of Both Time Tim and SAYS GOL COL sit 11 ThUll t it Gt t kt h t Mh March lock II au at Panama to 10 IllS p plan I IM most Not ot thu but It t of f time nd monsy over Ut phil Cot Col M and hIef of lbs c thuR Ihu t nhi th Ih lock Ik of the raMI In a J lal report to lbs com om lon made public todaY tody n ftc cul th the of 01 bJ metal and others and them to arguments tO co up thIr Im Novembers slIp lIp In III the cJ m In Cu I d MIlL lUlL This slip MYC r h he probably would III hB n un unnoticed no but for tor the at al thI tImi a stood hood lit hR the eh e eJI JI 1 had bad such luch proportion am amt t U a portion or of Ih the Panama rail raU I of o A newe newel I l w 91 bl his o I tilty rr II a story tol and nd at atti ti th flood to the drop dropping pin or of ort th t h Ju I U fl dam tha m Into the subterranean unde tie dam and nd locks which l nd I the he nw of the ot of the to the tate elate to the report the Ive the problem Ut r lh the ot nf the e and I It ft II he be no doubt In the mind who impartially Ine I I tw h It II MI that the solution I It I oJ t but sate afe to 10 the sea level canal Col oi I Ii To tw bt II U ur 11 the partIsans of th the ama tYl aue l to eUm elim mate both bolh th the Gamba dam sad ad the lOk lodl by making tile lbs eo 0 whip w de s to reduce duel the that t te suit from tile the discharge of the Chagres and the difference In tides tide but fall to how their propose to control or the Ch the bed which I Is 60 feet ahoY the sur ur of r the tho at t the juncture they nor any on one lime cn can ot of tr fr thru as to time lime and ot for 1110 he of such uCh a canal as Ih thy now advocate H the oat cost of a ak 11 k and 08 level canal Coi Co Goethal Goethals s Th The coat cast by the present for the adopted x luding th items Item let out by tilt Ih board or f I ii Il Itt lt lr Ir to title be 1 11 the cost t of sanitation nIt nt government until th the comple In ot At the thu WOI aD and the price the total Cost coat to the IId statu tIO ot of leek or of al ill Il I tO 1 I 1 the pre Pf lb these there are fau The cost or o the sea level ill tnt for Ulna sums up UI UIt upI t I and ir H to thim be added I III II i t of nr and civil govern up U t l the the completion of I th the anal unai which will be at least INUIt st arH than Ihan the lock canal and nd I th he 1 rl the total coat COlOt to the tho ilal will aggregate te 0 the probable or of on n the canal the report 11 Ih thc last eart quake of any In ill Panama occurred In the century and nd that runs In Panama clearly ht no of any violence have the eighteenth p 1 nIneteenth at 01 l I you that several YenI I n no than Ihan Jan I 1 1511 oven I moat ardt ardent nt sea level advocate V ill ih In the through the lbs wal 1 admit that the to navi II II a at 1 a hh rat rate of 1 Oed through Ih the lake ld and wIde chan ehan l J from to Pedro Pdro iguel tar far U tI nall or of he e pate fe c up to 10 end nd down from the summit level leyel You have been beell told to hitch hUc your Wagon to 10 U a wa wilt will you That all tight Th There are 1 however when you should hould as it nature the spring is III 0 uM of oC oCth th tUnes Nature Is now undertaking to 01 close ur lt If you tak floods ar I H the will be suc adul complexion bright Mud ellar |