Show Raise from Adit Con Connecting Upper Work Costs EASTERN OFFICIALS PLEASED Hotter Lead When bH and J of the Apex Mining company for on tho went that had at lait got out of ills at is cn time and the of ot for tile the of S the visit Oll vrr a plan oC for the with ot and goi 1 saving 4 1 the cost 60 to The Pari and the mine bj means of r Bl InK loom for tho opeia of to besides a Tho uplift will be from tho adit level to the objective on the v bile of the can h oie will no han titter bolus into the mine cai which be to the Par adit convoked to tho new bin to bo constructed at a convenient point on tho Boston dated brunch of tho The point beginning of the mutely In the poi tailor the adit while the Crom tho to the Boston 1600 feet the org t class oio load od cars ind thence sent on lo the The 1 a ton on the basis of present metal the company a ton The second oto will have to un i idel del go concen tuition but what pany to do in the way of pro is yet undecided It utilize the gulch mill In a and expense of setting to It The conix pany hai an to dispose of ofUs Us equity in tho do so i f fOn On vol of hasl d v l one ot tho of galena ore found in thy It has been for a length of and a width of feet and lies In av blanket formation between lime The width of the high giado and the to 15 feet There aie well defined ding planes all between In property designated ai the Andy Petro and bedding planes The connecting of tho venue adit with the upper workings of the mine will tho of the aerial being used and on the will more economic situ situation at the Utah Apex mine |