Show II I LOWER MAMMOTH MAY RESUME WORK Meeting On In This City Today To Go Over Sl Sitti aton MORE DEPTH IS NECESSARY n II Hen Heady for hush le Is Qun for tor lC Ac of Is out great reat results are expected tram roan the Mammoth meeting whIch started at 2 today This Is being hell 1011 In Inthe the offices and in III I a regular I bil buit It IR ha onO more than ordInary lond good will come Olt out of It The he Ort first greatest of nf these Is the expected doc Is Ion to resume o II at th tho property crt When Whon tho order closIng the tho United States Slates Caine I it WI Was fat tal I lowed Joed b by 1 ito that tIm tho Lower woul would shut Rhut down tor tar nn an I na the tho Lower Jower output wait Il contracted t to the U IT S In fact the tho smelter notified the o of the Lower that I it coull could take no more mOl ore oro after atter 1 Nov 16 15 TIthe hlll have caused no o of to 10 the S concessions were aind soy rl shipments were cro mi match do after atter No Now embt 16 10 TheRO and andIn andIn In r the tho property WiH waite forced to shut down wih at the PI prop P Perl erl orty del and devel dayel 11 oat 1 a large scale cale Now No that certain conditions have hae cone about I it is t Ilef tho nl this afternoon wilt will see HOC at a decIsion lon I to resume issued HEADY Otto One cause for tor In this L Lu fuet that the Tuttle smelter the Plant wi ho bo read for tor bush nC noes K Ma May H 15 The Tho Mammoth ii 10 live mils mites awn away from the tho smelter tar ter arll antI on Lii railroad The 10 11 thing needed noW to Iet get the ore rena mine to 10 Is switching and nn an tram Imm could ha be built hullt It If a fi beter hotter labile modo of transportation tion The he cost of by raIlroad however Is slight O and when the stuff to bo be shipped II Is taken Inlo lion tim UIO I lI officials I vel veay IOS rosy MORE NEEDED I in plent plenty of gO good 11 ore In the hut one tiling thing which hilch wI will do mur allure towards the tho L Lower er lavia Inlo 1 its own wi wilt be the sinking of the main shaft from roan 1 a of the depth to 2000 tint Tho rho lowest workIngs ot of th mine are aro now OW tit It n B depth ot of 1600 cot hit bitt tItle thIs depth II is reached by an auxIliary shaft feet from tim main Bhat shaft With an arrange Iko ilko being double ox le In there thero Ii Is IUle little doubt that the main initial shaft vI be Il ion UI that Practicable and poe po 1110 Boslo tIm tho in at depth 11 stray exports Al All IN are he be hIl lug lit at meeting The flows that Ihal In to be 10 wil vIli he be received with delight 1 In mm circles 18 as the thie L vcr lB Is regarded M aae Otto of most rel reli reliable able Within 10 five month months Inset Or It distributed thousands or dollars In dividends among Is its and wih with development under wn way In In style tle biG big thIngs are expected or of I it |