Show crete crete rate spot water main conduit length farm four diameter prom run latera late ralls diameter thirty feet apart late late rate small bole bole hole slid slid site slid site bind pin being cap keep dirt water hole itt minute thus ground sufficient moisture cove METHOD METHOD ETHOD water instead being surface soil novel method Irrig being tried part part pant wet wet west system water instead being Lur fLee fLee face soil soil under surface method basis open place tenth land average oft oft ott land whereas soil system water way water lest lest lost arid leakage plot texas twenty get 5 water system single horse engine entire twenty note system concrete pump |