Show WORK AT CROWN POINT Eureka March Maceli 16 Sinking of ot the tho Crown Groll shaft will wi start this week the station MaLlen Maton at the tho 00 level levot having been bean Icen practically finished At the tho Iron Blossom sinking Is still In 11 progress and all nt at this time the tho shaft shaf Is down something over feet feat Work la is still Mill going on on in the tun tunnel nel lel lid which was run In lit from the sail rail railroad ial road grade to tap tall tho tim Iron Irol Blossom shaft at aln a depth of ot feet The Tho stance stanco between the thc mouth of o this tun tunnel nel ad and nial tho thu Iron Blossom shaft shU Is be bo between tween and TOO feet |