Show noid ID BUILDING ON STRIP r anson p g smith hemphill and harry price refund last week bota from a trip into the north part of the county this ca carrying V e ying cibeu through needle needles las tam vegas st ot att af ii i i j i Ile ihlefield field st george hurricane and short creek at littlefield LUtle field the work being done on the arrowhead trail was almost completed under the direction of 0 J H reber this work cuts out the heavy grades and billows of sands and when the project is complete the road will be the best on the entire trail mr air reber and his tion have been hard at work the larger part of the winter and are now closing up the gap into mesquite the work ot of building from short creek into the settlement of that name has been hampered by bad weather but nevertheless the heavy grade from the floor of the valley to the plateau is almost completed and the work will now go along swim bingly this piece of work Is one of the best in the state and we feel that it will stay there for all time the work has been under the direction of william murphy and J H gallagher and Is certainly a credit to them mr murphy built the road over union pass and that piece of roadwork has no equal in the state the people of the north part of the county need more roads built into their territory and Is to be hoped that a further sum of money may be forthcoming to help in the good work it takes roads to develop a country and these people are sure laboring under difficulties kinsman kingman miner bliner |