Show DIME IO ioalla ALlt COMPANY BUILDS GOOD UE LINE the new line being constructed west from cedar city by the dixie power company over which to transmit the high tension current from their santa clara plant for supplying this valley Is a most substantial affair and should stand for half halt a century practically without attention the poles are all of imported cedars of generous size and about 30 feet in length above the ground they have charred butts and bear two cross arms tor for taking care of the heavy duty copper lines and a telephone system it Is quite evident that the dixie power company is here to stay and is not doing things on a temporary makeshift make shift basis the wire and insulators sula tors are arriving and the management announces the expectation of having the line completed and connected up with the main plant by the of june in the mean time the company Is giving cedar city a very much more efficient and dependable service wita the old plant than we enjoyed before their coming here it Is a matter ot of every fellow to his trade making and supplying electricity is the business of the attaches of the dixie power company who are specialists in that line iron county record |