Show TO 1 1 U 1 y sealed bida will be received by the undersigner undersigned under signed up to 10 0 clock a m oct 10 1918 tor the following one set tor the complete erection in elusive of heating and ventilation ot a one room frame school building at new harmony utah according to plans specifications and details therefore as prepared by chas S cottain Cott aiu architect st george utah and which are open tor inspection ot bidders at the office ot the under signed at st george utah bids will be publicly opened and read at said time at the office ot the under signed each bid must by a certified check tor at least 5 per cent ot the amount thereof payable to the undersigner undersigned under signed the amount called tor by said check to be forfeited it the bid accompanying it is accepted and the bidder then tails to enter into contract or to the required bond A satisfactory surety bond or personal bondsmen tor the full amount ot contract price will be required ot the successful bidder A deposit of 1 00 will be required on each set ot plans given out the time tor completion will be an element in determining the award the right Is reserved by the under signed to reject any and all bids BOARD OF EDUCATION washington county school district baw 0 bentley jr clerk |