Show stake academy work work is progressing nicely on the academy under direction of thorn thomas is P co contaoi Cott atam aoi the foundation is 13 completed it is of reinforced concrete amo feet wide on top wider at the bottom and at the corners four feet wide at bottom the ground was nas well nell tamped camped before foundation was laid and the foundation appears as a solid rock that will stand for many generations to come seventeen Se enteen tons of cement was used for the concrete foundation this week meek the masons will commence work mork on the basement story winch which will be built of black b basaltic rock eleven and one half halt feet high aboe this the building will mill bo be of red sandstone pitch aichler stale the basement floor will bo be of cement five fire inches thick the plans plan show a magnificent building buildings one that the people of dixie will be proud of and an institution ution that besides caring for our own high school students nil mill draw pupils from froin distant points |