| Show ImpORT ON as PUBLIC GS Wa Washington Oct annual report of nC the tho supervising archItect of the tho shows howa that during the year car ended June 30 1906 1006 46 new publio buildings Ind and le five oxton ions to ole old buildings Waco completed and occupied amid durIng the tho same 11 1 IW new buildings were which with 3 38 under tinder contract contract an antI I not completed maks 5 In course ot of erection The Thc whole number of public build lags completed and occupied by the tho is 19 l l lIha The Iha appropriations during the year Jun Juao 30 1906 for tor slee sites eon con ot of buildings boating Ight light otc etc amounted to U 39 whIch 1 together wih with contract liabilities existing l on Jun 30 1906 make I a total of |