Show Board Hears Favorable CUP Report At a m meeting eting in Salt Lake City Friday Utah Water and Power Board heard a favor favor- favorable able report on prospects of 01 an early beginning be to the vast Central Utah Project Frank M Clinton regional director of the US Bureau of Reclamation told the Board that provided a repay repay- repayment ment contract Ls is signed and an appropriation obtaIned from Congress pre construe tion work could be started soon alter after July 1 1 MR CLINTON complimented ted Gov George D Clyde and the Water and Power Board staff for their work in ob- ob obtaining obtaining petitions for the Con Con- Contral Utah Conservancy Dis- Dis District The Board allocated 25 25 for grouting Red Creek Dam near Fruitland and for repairs and improvements to the distribution system Work was necessitated due to water leaking around the dam through a gravel strat um PENDING approval by the I irrigation company the Board approved a proposal of the State Stale Park and Recreation Commission to install recreational facilities as part of the Big Sand Wash Dam under construction near Upalco Du Du- Du Duchesne chesne County |