Show CUSTOM MILL IT AT ROUND MOUNTAIN Preparatory Work Finished and Will Soon be he Under Way DEVELOPING WATER SUPPLY f t Off If k kAMO Auto AMO 0 Track 1 w wr fl i r c c H 14 who he M Is pei p lIv conducting th It Ie O o itI at t tw k Mw w mill alt of t f ts tM Moun n nf a Deduction f at t 11 loin Nev that o the te tb emea esca work for th Hl Ihl on II U now floW and ad everything M S I t fe t upon II th arrival aal 4 ot Of f tM tat lumber and nd T Th ft n Mv ve v chipped from frum fr m Denver an ant md Salt t tI I Jae and atil a should be b on un tM the th round 4 a hort tm The SIte rite lilt of 01 the tb n flew w Itom mill I III on Afi no hone bone CIk Mm a few Ie ew hundred yard below th tits the w milt While bk tie waiting for lor the th machinery t tam am arrive manager Nairn NV Na O I ic a Will well I which he 1 intend to tt put down a m cull at depth pt to tu obtain the bedrock flow IoWla TM TIlt la In Ia a ell difficult tack luk HI s I much mao water II Is bring encountered at t a hallow depth clad aim this thin interfere greatly U with the work if Ie the Ih h pitch ot f ih thO he heIt bedrock Ui It for or Us is S construction Mr er Nairn v will III build a It This II would ww Minnie nahl him i I the th water sod and have huV ha a rit tiM al r 1 supply bd raising IMI tin th ii I c I in t any a required Ihl NI n 1 OF OP 0 ORES We W KM dy to o put the Uta rani ut up utIn litIn In v VY vr ry order n fl ne ron n HP All n the th ma Ins materiel arrive hut but ar an liW at th tile en entire n fl tire Irv mercy 0 ot if r th 08 l we W can ti only lv lip hop h f that t then th will be nn ni n iI I 1 il II lav sail 1 Mr dr N Nn Nair r Wh the th I h mill ill IK Is completed there ther will bt be no WI II Iirth of r f ores or as II s wr w have II enough front the th ramp 1111 in I tc Insure operation fur for mure M 11 time I hue AUTO KOR Fon HAILA It I III Ia the th intention of or the lh manage management ment to put ut in two IWO or ot t three auto aut trucks to transport I the lie tile ote r from the Ihl th mine nIne mineto mineto to the mill This will necessitate tin du building of or a 11 special road mad hut but thin til ran pu n be easily accomplished and nd a grade obtained that will permit the hauling of if f from fr rn three tr to live ton at t tb the rate rte It s 1 11 mil mUsa an hour |