| Show Asked To Complete te tel l U it Oni Only I need be ap for the fiscal year be beginning l nh g July duly 1 to complete the of th the Cen trai Utah Project Senator FranK E l Moss DUt D Utah h told the Senate Public Public Works Appropriations t ns Committee I last week In a status report Senator I Moss Informed the sub om The Vernal Unit is located in Uintah County and is mul purpose tl-purpose in hi his s scope ope The unit furnishes a supplemental wa wa- wa water ter supply to provide irrigation tion to acres of partial partial- partially ly Irrigated land and 1600 1000 acre supplemental wa wa- water ter for Bene Bene- Benefits fits are also provided to fish and wildlife Construction will be approximately 99 per cent complete by June 30 1962 1902 A total of has been made available for the construction of this project and the he fiscal year 1963 program will com com- complete construction of the unit except for tor drains and permanent nent operating facUlties facilities The appropriation request of 21 21 for fiscal year 1963 is required to complete work on Utah State Highway 55 pre pre- Pare final construction re- re reports reports ports and built as-built drawings and for collection of design data for drains And he urged appropriation tion of to continue the reconnaissance study of the proposed Gray Canyon Unit of the Colorado River Storage Project It would con con- consist of a purpose multi dam reservoir and on n the Green River near the bor ders of Emery Carbon Uin tah and Grand counties The report is scheduled for tor com com- completion during the fiscal year beginning July 1962 1902 |