Show i r pf pra pras r s W S i j j C vi jp i v ya 7 F fin 7 ISo r 44 y i. i t C t V tS j Lr y 4 N- N e H U J k ate r r in vV H J v PROFESSIONAL PLAZA Vernal's newest office building buildIng build build- Avenue Ing complex Is going up on the corner of Vernal Avenue Av and Second North The structure will be faced with brown brick with wood siding over the covered walkways Professional Building Appears on Vernal Ave Construction of a professional office building is well under way on the southwest southwest southwest south south- west corner of 2nd North and Vernal Avenue t to be named Professional Plaza Pla Pla- za The new business venture is being built by the partnership of James G G. G Drollinger CPA owner of a local accounting accounting ac ac- ac- ac counting firm and Dr Jack A A. A Seitz p met st owner of Seitz Optical The square foot building will contain contain con con- tam tain n the offices of Mr Drollinger's firm and Seitz Seltz Optical beside the law offices of John C. C Beaslin and Kenneth G G. G An An- The fourth section of the building building build build- ing containing 1000 square feet is still to be rented reported Mr Drollinger THE STRUCTURE is modern is-modern construction construction construction total electric all carpeted with wood paneling A large library room and a conference room are outstanding features of the building Over 1000 square feet of outside covered walk space will willbe willbe willbe be used for outside entrances and an opened way walk walk between the two wings of the building A parking area will be provided inthe in inthe inthe the front and back totaling over 46 car spaces spaces BERT L L. L Angus is the contractor of the new structure and Edwards and Daniels Daniels Daniels Dan Dan- arc are the architects in Move Move-In date has been set for the first of August |