Show wv v vv w v Y v v w wr wr w w v v w r rv w wa www vr ww wv a I p R nn a y r r re r Nam erv r q t LV n 4 r r u i DIGGING OUT the concrete culvert pipe at the Vernal airport is expected to cost the com com- community nearly in construction expense The pipe will be reset at a deeper level with the ends opening into concrete collection boxes Staff photo Culverts Are Cul Dug Out Installed Re-Installed The work worl- of tearing out out the conCrete pipe culverts which drain water runoff from the main runway and taxi strip at atthe th the Vernal airport day Of f last week WE HOPE TO TO be finished with this extra work by next Friday that that Is If the th weather holds said laul aul r of f the Const to Co prime contractor for the recent renovation which the air fa fa- fa facility underwent The work demanded b by t the e Federal Aviation Agency op will cost the community ac ac- ac according cording to Mr r THE MONEY is available inthe in intile tile the contingency fund said AllI Air por port Board Chairman Ralph This fund Is an eXtra 15 percent Of th the job estimate added to the work fund to pay for unexpected such as s the one brought about by the I culvert work We had hoped to o save that mob y rand ln US use it some other way Mt Mr m nt d THE WORK on the culverts I ITHE ln digging th the newly b built earth fill gravel base and asphalt aSI h lt surfacing of of i J m 1 II t Ma al THE EXPOSED END of this culvert pipe ledan FAA tor to delay the opening Vernal prior approval given by the FAA engineering d The wheeled backhoe dug pava ling to relocate the pipe Staff photo the connecting strips to expose the con concrete rete pipe The pipe will willbe be set deeper into the ground and concrete gathering boxes built at ea each h end of the the pipe flush with witt Ute thee surface of of the hf ground The water will viII run Into a horizontal grate on n top lop bf the box will flo flow Into th the pipe and I be forced up and out of th the theother other en end l by the press pressure rc of I more Inflowing w eater ter It will be b similar t to toa 3 a s si- si siphon I phon n system Mr said I said Watery Wat r ill ll c collect in the pipe bUt the pipe ild ho b be deep enough In In the ground fp o t freezing and breaking r t |