Show Survey Started for Lapoint Road The route of a proposed road to connect Maeser and Lapoint is being surveyed by the county surveyor Nelson Mar shall The survey and specifications should be ready for bids to be let on the road by next year Mr Marshall reported fol fol- fol following lowing a meeting with four members of the state secondary roads system and two county commissioners E Paul Ed Lovelace r Roy Slack and Gordon engineers with the state ro road d system comm commissioners Rulon Hacking and Harold McKee and the surveyor met to lay laythe laythe the groundwork C r the propos pro JOs ed cd road All surveying ying will be dOne by bythe bythe the county i engineering for the project will be handled by the state engineering office |