Show Repair Work At Now Complete The repair work on Dam was completed Thursday of last week by Continental Drilling Co of Los Angeles IT LOOKS like a very good job reported L Y secretary manager of Uintah Water Conservancy District The amount of the contract was Work consisted of drilling one clay fill fall with a three inch hole When rock was encountered a 1 inch diamond drill was waa used with water and as the pressure was lost the leakage was tilled filled with cement I DRILLING was carried outto ouno a depth of feet with the for for for- formations I grouted as the depths were increased eased or-as or as the drill lost water |