Show bids on halfway hollow ft duchesne called contract U I 1 be awarded by the state for the grading and gray grav eling of 9 stile stretch of road from half nay hollow to fort Duc duchesne lesne on february 24 bids for the construction and travel gravel surfacing of the miles of road from the halfway hollow to fort duchesne have been advertised verti sed to be opened on fb fob 24 at salt lake city by the state road commission the federal fund will be DOO and labor for asphalt surfacing will be when completed the US 40 will be asphalt surfaced from the high line canti at vernal to fort duchesne the no work Is now being done for the gravel surfacing of US 40 from roosevelt to myton nearly 9 miles which will also be asphalt paved in the spring the surfacing of this strip of road I 1 is a being done under the and the paving will be from the federal fund |