OCR Text |
Show Bridge _ ridge andRoad andRoad and andRoad Road ProjectsAre Projects ProjectsAre ProjectsAre Are Inspected InspectedMembers Members Membera of at the state road com coin comm.ss1on coinmission cornmission m.ss1on mss1on mission ! . were In Vernal Tuesday tolook to tolook tolook look over the proposed bridge pro proJects projects proJects Jects on the Vema1 Vemal-ManUa Vemal ManUa Vernal-Manila Vernal Manila - Man11a High High- Highway Highway Highway - - way and tTS US 118 40 and also to inspectthe inspect inspectthe Inspectthe the road between Vernal and the theColorado theColorado theColorado Colorado state lineIt lineIt line lineIt It was announced announoed that a con- con contract contract con contract - - tract would be let In the near fu- fu fuure fuure tu-ure tu ure - - ure for a $20 20 $20000 20000 $ 000 concrete bridge bridget bridgeit bridgeit \t t it ' \ the Halfway Hallway Hollow with 80 toot foot tootteel footteal footteel teel teal I beam It Ls is planned to tooe tose tose oe se ; presen present t piers and raise the lev 1ev lev1 1 of the bridge seven feet This ThisI ThisvUl Thisvu ThisfW I vUl vu Includ tnclud about one third mile mUe or of orgrading ofgrading ofgrading ofgradingFor grading gradingFor For the construction of a bridge bridgeover bridgeover bridgeover over Ashley creek and two miles ot of otroad ofroad ofroad , road work on the Venal Manila ManilaI Manila'iighway Manilahighway ' 1ighway 'iighway iighway ' $40 40 $40000 40000 $ 000 has been allotted allottedI allottedThIs allottedTh's allottedTh's allottedThs I ThIs Th's Ths ' structure will be of ot concretewith concrete concretewith concreteI I with a 60 foot steel I beamIn beamIn beam beamIn In the party were Jerry Kn Knwl Knwlton Krwwlton Jwl Jwlton ton engineer P W Masters bridge bridgeengineer bridgeengineer bridgeengineer engineer J C e Mulvllle Mulvtlle Mulvilie districtonneer districtng'neer district districtn'neer onneer n'neer nneer ng'neer ngneer ! ( ? ' ' and Preston Linford Linfordhighway Linfordhighway Unfordhighway highway engineer engineerof of the public , I roads administration administrationi administrationMr adml admlMr Mr } Knowlton thowlton said parts partJI of the theI theStrawberry thestrawberry theStrawberry i Strawberry administrationI valley roadould road would \\ould ould \ ou1d be bere bere I I re oiled and that sections of the thehighway thehighway thehighway highway between Vernal and FtDuehesne Ft FtDuche FtDuchesne Duche Duehesne . ne which are treacherous treacherow & n wet weather will wtll wifi be surfaced surfacedwith surfacedwith surfacedwith with chipped pebbleThe pebbleThe pebble pebbleThe The asphalt road between Vernal VernalI Vernaland Vernaland I and Myton Is holding holdJng up fine saidMr said saidMr saidMr Mr Cnowlton Knowlton |