Show new lunch room leads remodeling at jr high school improvement of lunching facilities cili ties has lead a remodeling and renovation project at ashley valley jr high school the old lunch room which was a former barracks building will be moved and ani likely used tor for storage space the new lunch room was previously used for the music room A classroom on the north side of the new lunch room has been remodeled and will be used as a kitchen in the north building the former uintah stake academy ceilings have been lowered in the hallways and acoustical tile installed on the ceilings the work is reported to have made the building as quiet as the new high school other work includes repainting five classrooms and sanding and re finishing some desks total cost of the project was in the region of 2800 |