Show workers apply asphalt 8 pha it on lapoint road utah state ro road ad workers tuesday began hauling from uintah county asphalt pit to a half mile strip of utah lust just west of maeser according to S bupt supt up pt harold mckee th this Is project project completes the paving 0 of the state portion of the vernal lapoint road with the exception of a half mile atthe at the hestend going into lapoint which tx Is considered in excellent 1 shape with a good grade of gravel uintah county last week completed a three mile strip of county 1 y road on the vernal lapoint road which completes nine miles of paved road lying between state owned road on an each end uintah county Is now hauling asphalt to the dry fork road paving ing a two mile section on up the canyon from where the present paving ends this work will probably be done in 14 another week according to county road supervisor david ellis elsewhere in the county work has begun on the paving of a seven and a halt half mile section of utah state stall road 88 between ft t duchesne and randlett it Is being surfaced as federal aid secondary project 1468 1408 the road will be a tk binch 2 inch mixed bituminous suT surface face |