Show NEW ROADWAY PLANNED OVER SLIDE AREA IN PROVO CANYON with the coet cost of removing a i small mountain cf of snow brought donn by a sno in provo canyon being prohibitive it U Is possible that a two way lumber ramp will be constructed across the debris according to 0 o state road officiate officials the work la Is expected to be under way friday or saturday so that travel through the canyon to cleber and uintah basin points con be resumed as soon as possible in order to avoid tin annual expense entailed by the removal of ever recurring snowed snow and mud slide slides the state road commission has authorized the realignment of the hig high higday hay ay for a distance of 2000 2 feet the proposed survey will take the road over higher ground in no danger of being flooded by the rise of the river and out of the path of the work h has not yet been authorized but pr preliminary Il plans and specifications are completed |