Show POWER COMPANY i installing NEW TYPE ENGINE ENG INE I 1 filst natural gaa gal combustion engine to be used U in the state will be seady for use at auxiliary fore part palt of do cembor cember work oh the utah power and light company new generating station Is progressing nicely the concrete bases tor for the machine have ill all been poured and will bo be leady for the mach Liol as coon soon as a they arrive arrhe which will bo be within the tho next few fian it Is 13 expected that the engine and generator will arrive friday or saturday the building Is now bearz put up and will probably be nearly completed ft tun the machinery arrives the me cl expect to have the plant ready for operation atlon some ume time timing the first port ina of december the me engine belli belaz installed is one ona of the artt t natural gas gag combus alon engine engines to be used in tho state natural gas Is fed into tho the chamber chambers of tho the cylinders similar to manner in which gasoline is U used in an nur mobile engine wook is I 1 brilliant thu year beades being practical pra cal healthful and comfortable i |