Show k OIL W WILL BE IN DURING WE WEEK ICK ARRIVED ON THURSDAY AND A NJ WORK ON RIO WILL KB DX HEADY FOR TEST TO START STAIT bad road conditions especially be watson and jensen has prevented presented tho the construction work on the oil rig ric ot of the utah refining company at the vernal dome beginning aa an oon soon as was expected it itis i is la expected the oil all derrick will be commenced saturday or early next reek week tho the studding spud ding in will then be made within a few daya days aad and continuous drilling maintained until the desired depth Is reached the pioneer dakota and lakota sands will be tested the drilling crew arrived in verbal vernal thursday and were on the ground early friday if everything moves along as it should the well will be studded in during the week other oil interests have been busy during the week securing oil lease in various sections of the valley the vernal st structure appears appear seto to be one atthe very best that has yet been surveyed Burve and geologists fits are oro anxious awaiting the outcome of the drilling by the utah refining from the beat reports obtainable it appears this structure Is to consi considered dereu the very beat yet tested in utah and Is in today the best in any new field in the united states |