Show six vats used to heat asphalt for pavement at the plant located in tho yard of cof the uintah canning factory where the asphalt Is heated for the paving ct if project no 10 C there are six vats in use turning out about one vat of the paving preparation an hour the asphalt Is heated with live steam from the boilers and also with a wood fire underneath the vats the asphalt mixture must be dry before it Is placed on the roads au soon as rolled the pavement is reidy ready for traffic harry allen expert on an waving construction has bas charge of the work ani while many new ew phases of the tb work are presenting themselves be he is satisfied the work when completed will be satisfactory to all the paving paying will not start in the center of town until after the fourth |