Show anew new shearing corral at jensen keady ready to start about april 1st 1 ed leis and joo joe hatch have bave con struven n alx six man shearing plant I 1 nt jensen chich Is located just aero 1 the tile bridge on the victory victor highway on the cant side of green river chev will start shearing about april first and after shearing sho arinK imilie a number at tit this plant will move to the white river at tho the indar IN dar bar ranch and then return to jensen and finish tho the reason chev expect to shear between and 60 50 sheep at tit the t two to o flints |