| Show STEEL ON THE WAY Architect Tolls of or lIme Iho Plana of 01 58 lii Ve SI mm tsu Architect Cobb of Now ol York says that thai the tile operations operation on the Iho build building building ing la properties now In progress In this city ell are aro In n a satisfactory condition Structural steel Icel will begin to arrive from front time the eastern cast om mills III In 10 days It is proposed I to have huu time tho hotel 10 storIes st high with three entrances and alit tWo tivo I VO years will be lot requited to erect the building The Time opening of the proposed new street J oust cast mutt tile the theold old 1111 Walker block In is now assured HO so that lint the hotel will have havo on onI three I streets Excavation will not ant be bc bepin begin gin pin until there Is III some show for lor thu Ih Steel Time The Exchange J built build building 1 ing will not bo tie until after hotel la is begun Mr Ill Cobb Cobh spent part of or yesterday tit at 1 t tho the smelter Mueller which ho thinks thInk Is something Immense |