Show SPANISH FORK ASSURED FEDERAL BUIrL DING SOON washington march G sen sena tor W H king today received assurance from the supervising architect that he would revive tho the project for the erection of a public building it spanish fork utah for or which an a appropriation was made by congress several years ago agg and would advertise t ise plans for the building in fit the tile na ne r future ho lie hop esby getting bids 1 t an early date data to be able to lot the contract so that work woric may bo be begun not liter than july let list senator klug king asked the architect 0 to o go into his flies and revive other at er public projects in utah for wh which cah appropriations have almady akrc dy been mado and to advertise for bids 88 IB as possible A further report will bo mido to the Ie senator ag as soon Is 14 the other utah projects have leen 1 een examined vernal Is among the towns for which public buildings have been authorized tribune |