Show r NA 1 4 I IL I 1 4 rs ka 7 0 ft 1 AW j oj r at 44 at xv 1 4 S 4 I 1 I 1 all top to d of the lh bureau of 1 I reclamation visit violt flaming grf gorge dam lost lat week to S make mak an of the tin and foundation and consult with project personnel an a design featured aatu raa tram the tha office effic ol of the th assistant Aai litant Colm 0 13 r and nd chief in denver at r loft left to right 0 L rico chlof dams branchi branch C E 8 8 ti Coh cF dam W it irwin chief engineering Engl noring geology branch and L 0 puts chief chi D ts lazah abdin Cb V din bosit they at ar dokla into the th right byway of the tk don dam in the th back ground 1 a 2 t ual 6 yd y d bhoj hoal and aid a six ix cubic yard lard dr drachin dra glin aclin excavating in the th river champl for ahi of the m bureau photo bv r is state |