Show plant machinery being unloaded plear near dam area carloads of 0 machinery grid and steel are being unloaded near naming aming gorge td id form an 00 gregath processing inq plant ant to farnish the million f tons of sand and crave gravel required by flaming gorge dam st ruction the components are being trucked from green river r railhead to ahe he linwood area the plant will be located on henrys rork fork D D baker project manager for arch dam construe tors tore reports tile the plant will bo be in fit operation tills this fall trucks will haul aggregate from the henrys rork site 47 miles from green river luver to a batching plant at the dam damsite site workers are facing rising waters on the green niver luver in work toward completion of the di venton tunnel which officials report as one fifth complete work is being concentrated on tile the inlet end and tion of the inlet control embly mr baker depotts repot ts that equipment ties lias been moved into inai position at tile the south alele of the site bite end and excava work for the dams south abutment has had begun A tood road permitting tort to view work on the dam li Is scheduled for opening june 27 |