Show highway ta jv improvement I 1 I 1 ri D on 19 mile ale V varnal stretch di 4 4 bureau Bur elit of abada 1 pec sonnet and contractors ganner abbot and waldron with heavy and abdad adad workers are pushing ahead to haprov it 19 mile section of 0 ve vernal matilla manila road I 1 originally as a gravel grave toad road 1 work began oil on gorge gorc reservoir pr pro t i gram at it was decided I 1 td include a sui tace I 1 mhd current contract calls for addin adding 9 adal I 1 iona iosub base basc material and placing 4 of baso course material vie the top op IW 1 of which wilt will b le bituminous stabilized 1 the reconstruction s building gt pAssing lanes on the sleep grades to enable normi normal ang traffic to pass bass thie ali slower and heavier lid lavier vehicles such as a logging krucka truc Ka 1 H 0 i floal nure Dureau hulot fot public hoad its lias 12 men on the job most mostly t it 1 1 f surveyors ano and inspectors the route begins beg t ri ns from ver utah staid IlI highway gIlWay 44 to the forest line part ol of the eta P 0 road will be rerouted go around the proposed nak atlle ito with the lureau contract cont raetA li llopez expressed thai an additional sit miles from the tbt the pie Adit contract to dreen greendale dale function may e under contract site time tills this fall greendale Oreen dalo Juned la Is the beginning bt flaming gogg oo gs j road i la 6 resi dent engineer in vernal for the division office bureau pt of P public 1 I alonda iam in ogden 0 |