Show rails for moffat road nine thousand tons of rails at an aggregate cost of have been ordered for the extension of the moffat load to the county coal fields by the denver steamboat construction company the order has haa been placed with the colorado fuel iron company will commence april ill 1 says saya 11 A summer chief engineer of the moffat load in speaking of the eten extension sion to steamboat springs from yarmony carmony Yar mony the present terminus of the railroad mr sumner says that rails will be laid as fast as grading work will permit rock blasting for the grade is being done in egeria egena canyon and a large force of workmen will be engaged for grading work in the open places as soon 1 1 klc e 1 as ag the weather moderates A number of coal companies are preparing to dev develops elope their properties and will be ready to make shipments as soon as the moffat road reaches there david 11 moffat officers of the road say does not own a single acre of coil coal land in county and is not interested in any companies which own coal land there D C dodge president of tho the danver steamboat construction company has headquarters with the moffat road in the Maj astle building his office adjoins those of general manager W A deuel and chief engineer H A sum ner steamboat pilot |